The Issue Panel & Timeline
The Issue Context Panel provides direct access to range estimates right on your Jira issue view. It visualizes the relationship between your estimated boundaries and actual logged time using a dual-bar timeline widget.
Anatomy of the Estimate Diagram
The visual timeline displays two stacked horizontal bars:
- Top Bar (Estimate Bounds):
- Dark Segment: Represents the Low Estimate (optimistic baseline).
- Mid Segment: Extends from the Low Estimate to the High Estimate, visually representing the estimate range and uncertainty spread.
- Bottom Bar (Actual Logged Work):
- A solid progress bar representing the total time logged on this task (including time logged on any subtasks).
- Vertical Markers & Labels: Positioned ticks mark the Low and High boundaries with formatted labels.
Color Indicators & Statuses
The timeline bar dynamically adjusts its color palette based on health and completion status:
- Blue (In Progress): Normal operational state for active or open tasks within healthy estimate boundaries.
- Red (Error): Displays when a task's subtask estimates exceed the parent's estimate (Subtasks Estimate Too High).
- Orange / Yellow (Warning): Displays when an issue is unestimated, or when total logged work exceeds the High estimate (Exceeding High).
- Grey / Neutral (Done): Displays once an issue is transitioned into a Done status category.
Open Tasks vs. Completed Tasks
The information shown inside the issue panel adapts to the issue's lifecycle:
When an Issue is In Progress (or To Do):
- Task's Estimate: Displays the current Low to High range (e.g.
2d to 4d). Clicking this value opens the inline editor. - Subtasks Breakdown: If subtasks exist, displays the combined total of subtask estimates and an allocation status message.
- Logged Work: Shows a transparent breakdown of time spent On Task vs. time spent On Subtasks, as well as the Total Logged.
- Remaining Estimate: Calculates the remaining range boundaries in real-time:
Remaining Low = max(0, Low - Total Logged)
Remaining High = max(0, High - Total Logged)
When an Issue is Marked Done:
- Original Estimate: Preserves the baseline range set prior to completion.
- Final Logged Work: Shows final total time logged on the issue and its subtasks.
- Variance Message: Evaluates estimation accuracy upon completion:
- 🟢 Under Low Estimate:
1d under low estimate (completed faster than optimistic floor). - 🔴 Over High Estimate:
4h over high estimate (exceeded worst-case ceiling). - 🔵 Within Estimate:
Within estimate (1d remaining to high) (delivered within expected range).